Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 9-2320-364-13&P-2
CENTER BLAST DEFLECTOR REPLACEMENT - CONTINUED
0027 00
INSTALLATION - CONTINUED
8.
Swing torque rod up into position under center blast deflector (17).
9.
Install two bolts (16), washers (7), and nuts (6) on torque rod (15).
10.
Connect steering link rod (3) to pitman arm (2).
11.
Install bolt (1), washer (5), and nut (4) on pitman arm (2).
12.
Install electrical connector (10), two bolts (12), washers (13), and nuts (14) on bracket under center blast deflector (17).
13.
Install two hoses (8), nuts (9), and glad hands (11) on bracket under center blast deflector (17).
3
2
1
4,5
17
6,7
16
15
8
417-137
11
10
12,13,14
9
END OF WORK PACKAGE
0027 00-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business