Click here to make tpub.com your Home Page

Page Title: Install Armor Kit, Side, PLS (RH), P/N 113310-2-103
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

II113300-1-103
Rev. A
3.5.3 Install Armor Kit, Side, PLS (RH), P/N 113310-2-103
a) Read this entire section before installing the Armor Kit, Side.
b) Use the instructions provided in Section 3.5.2 to install this Armor Kit. This kit is a mirror
image to the previous kit, and the installation procedure for this kit is the same as the
Left Armor Kit (P/N 113310-1-103), with the following few exceptions.
c) In this kit, the part number for the Armored Door Assembly is 113320-2-103. Substitute
this part number in place of 113320-1-103 of Section 3.5.2.
d) When installing the aluminum and steel armor panels, verify that they are properly
oriented. The aluminum armor panel should always be located on the outside covering
the steel armor panel.
WARNING
INSTALLING THE ARMOR PANELS IN THE INCORRECT
ORIENTATION MAY DEGRADE THE PERFORMANCE OF THE
ARMOR SYSTEM.
3.5.4 Install Armor Kit, Rear, PLS, P/N 113350-1-103
a) Attach the Bracket (P/N 113352-1-103) to the Rear Left Panel (P/N 113351-1-103) as
shown using the hardware in Figure 36.
b) Attach the Bracket (P/N 113352-5-103) to the Rear Right Panel (P/N 113351-2-103) as
shown using the hardware in Figure 36.
c) Attach the eye nut (P/N 106795-1) using a 0.375-16 X 1.250-in.-long bolt to one of the
vertical facing holes and attach a lifting strap to the eye nut.
d) Using the lifting strap and material handling equipment (hoist, forklift, etc.), position the
Armor Panel above the cab such that it can be slid between the cab and the equipment
directly behind the cab (see Figure 37).
e) Open the access panel on the vehicle and carefully lower the Armor Panel so that the six
holes located on the edge of the Armor Panel line up with the holes in the Angle Bracket
installed on the Aft Armor Panel Assembly.
f)
Once the holes are aligned, insert a 0.375-16 X 1.500-in.-long bolt through the top and
bottom holes. Use a nut and washer to temporarily hold the panel into position. The
panel will be fully secured during the installation of the roof armor kit.
g) Remove the eye nut and, using the same instructions as before, install it on the other Aft
Armor Panel assembly.
0037 00-64

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business