Quantcast Operatorís Preventive Maintenance Checks and Services (Monthly) - CONT. - TM-9-2320-364-10_221

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Operatorís Preventive Maintenance Checks and Services (Monthly) - CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Operatorís Preventive Maintenance Checks and Services (Monthly) - CONT. - TM-9-2320-364-10_220
Up
TM-9-2320-364-10 Truck Tractor Line Haul 52 000 GVWR 6x4 M915A2 Truck Tractor Light Equipment Transporter (Let) Manual
Next
Operatorís Preventive Maintenance Checks and Services (Monthly) - CONT. - TM-9-2320-364-10_222
TM 9-2320-364-10      2-147 Table 2-5.  Operator’s Preventive Maintenance Checks and Services (Monthly) - CONT. Location Item No. Interval Item to Check/ Service Procedure Not Fully Mission Capable if: 99 Monthly Crane Remote Controls - (Cont). (j)  Move SWING control lever (9) to CW position to turn boom (10) clockwise.  Be sure boom turns in the clockwise direction. Keep boom clear of all electrical lines and obstacles while operating crane.  Serious injury or death could result on contact. Keep hook block at least two ft. (0.61 m) from end of boom.  If hook block hits end of boom it may damage cable or hook block and crane will lose control functions.  Wait six seconds for power to return and check crane for damage. Do not let cable become slack or cable may get tangled on drum. (k)  Move HOIST control lever (11) to DOWN position to pay out cable (12) approximately two ft. (0.61 m).  Move HOIST control lever (11) to UP position to take up cable (12).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.