Quantcast b. Lifting Frame in Unlocked Position (Load and Unload Container, Install or Remove Lifting Frame from LHS).

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Lifting Frame in Unlocked Position (Load and Unload Container, Install or Remove Lifting Frame from LHS).
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
2-37.  TRANSPORTING LIFTING FRAME WITH PLS LHS   WITHOUT CONTAINER
Up
TM-9-2320-364-10 Truck Tractor Line Haul 52 000 GVWR 6x4 M915A2 Truck Tractor Light Equipment Transporter (Let) Manual
Next
2-38.  RETURNING PLS TRUCK TO FLATRACK MODE
TM 9-2320-364-10      2-571 b. Lifting Frame in Unlocked Position (Load and Unload Container, Install or Remove Lifting Frame from LHS). Lifting frame weighs 1,600 lbs. (725 kg).  Personnel must stay clear when installing or removing lifting frame to LHS hook arm hook. Failure to comply may result in injury or death to personnel. NOTE There are two locking plates on lifting frame.  Both locking plates are locked and unlocked the same way. Right side is shown. (1) Remove quick release pin (1) from locking plate (2) and bracket (5). (2) Rotate locking plate (2) up to disengage LHS hook arm pivot pin (4). (3) Install quick release pin (1) in locking plate (2) and bracket (3). (4) Repeat Steps (1) through (3) for left side. 1 2 4 5 3 5 1 2 4

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.