Quantcast 2-40.  RAIL TRANSPORT

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-40. RAIL TRANSPORT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Remove and stow chock blocks
Up
TM-9-2320-364-10 Truck Tractor Line Haul 52 000 GVWR 6x4 M915A2 Truck Tractor Light Equipment Transporter (Let) Manual
Next
Position ISO corner lock
TM 9-2320-364-10 2-608      2-40.  RAIL TRANSPORT. a. Rail Transport Strut Installation. NOTE Ensure ISO lower corner castings are free of dirt and debris. There are two ISO corner locks.  Both are installed the same way.  Right side shown. Ensure container is fully loaded on truck and rear container locks are installed (Para 2-33 through 2-36). (1) Lift pin (1) to unlock lock handle (2). (2) Loosen handnut (3), rotate lock handle (2) 90 degrees and remove ISO corner lock (4) from stow weldment (5). 1 2 3 5 4

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +