Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: VOLTAGE TEST
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-2      2-1243 (1)   Remove ten screws and sunshield from instrument panel. (2)   Pull top of instrument panel towards steering wheel. (3)   Disconnect headlight switch connector. (4)   Connect positive (+) multimeter lead to wire 1292 at headlight switch, terminal 3. (5)   Connect negative (–) multimeter lead to a known good ground. (6)   Turn ON ENGINE switch (TM 9-2320-364-10). (a)   If 10 to 14 vdc are not present, turn OFF ENGINE switch and repair wire 1292 between headlight switch and first splice to connector MC2, terminal Q (see schematic Fig 2-31 and FO 1) or notify DS Maintenance. (b)   If 10 to 14 vdc are present, wire 1292 is OK. (7)   Turn OFF ENGINE switch. VOLTAGE TEST Remove all jewelry such as rings, dog tags, bracelets, etc.  If jewelry or tools contact positive electrical circuits, a direct short may result.  Damage to equipment, injury or death to personnel may occur. (1)   Turn on headlight switch (TM 9-2320-364-10). (2)   Set multimeter select switch to ohms. (3)   Is continuity measured between headlight switch, terminal 1 and terminal 3. (a)   If there is no continuity, replace headlight switch (Para 7-27). (b)   If there is continuity, turn off headlight switch and repair wire 1049 between headlight switch and headlights relay R1 (see schematic Fig 2-31) or notify DS Maintenance. (4)   Turn off headlight switch. (5)   Connect headlight switch connector. (6)   Install instrument panel and sunshield with ten screws. (7)   Install 15 screws and two ECB covers. CONTINUITY TEST

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business