Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-3      2-2017 (1)   Disconnect connector MC109 from CTIS front manifold. (2)   Set multimeter select switch to ohms. (3)   Connect jumperwire between wire 1056 on CTIS controller connector MC111, terminal 1 and a known good ground. (4)   Is there continuity between connector MC109, terminal 1 and front manifold ground braid? (a)   If there is no continuity, repair wire 1056 (see schematic Fig 2-48) or notify DS Maintenance and perform Steps (6) through (9) below. (b)   If there is continuity, wire 1056 is OK. (5)   Check continuity on remaining wires and terminals using Steps (2) through (4) above.  The wires and corresponding terminals are listed below (see schematic Fig 2-48). 1057(2)    Shield(8) 1058(3)   1061(6)   1064(9) 1059(4)   1062(7)   1065(10) 1063(5) to ground (MC 109 only) (6)   Remove jumperwire. (7)   Connect connector MC111 on back of CTIS controller. (8)   Connect connector MC109 on CTIS front manifold. (9)   Install instrument panel and sunshield with ten screws. CONTINUITY TEST NOTE Terminal (5) at MC 111 is plugged and does not connect to Terminal (5) on MC 109.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business