| |
TM 9-2320-364-20-3
2-2746
14.
Repair black wire
(see schematic
Fig 2-58) or notify DS
Maintenance.
Verify repair, go to
Step 15 of this Fault.
YES
NO
WINCH/CRANE switch in
CRANE position.
Main hydraulic reservoir full.
Outriggers operate.
Outriggers down with weight off
truck suspension.
Crane tubes and hoses OK.
Accumulator and tube OK.
Hose 2776 OK.
White jumper wire from terminal
19 to 20 OK.
Outrigger proximity switch (RH)
OK.
Outrigger proximity switch (LH)
OK.
Red wire from terminal 5 to
control lockout relay OK.
Black wire from crane terminal 1
to control lockout relay OK.
Green wire from control lockout
relay to black wire OK.
Control lockout relay OK.
Blue wire from control lockout
relay to crane terminal 8 OK.
Crane system hydraulic
pressure valve harness
connector white wire OK.
Crane system hydraulic
pressure valve harness
connector black wire faulty.
KNOWN INFO
POSSIBLE PROBLEMS
TEST OPTIONS
REASON FOR QUESTION
Continuity test.
STE/ICE-R #91.
If connector black wire is loose
or faulty, system hydraulic
pressure valve solenoid will not
be grounded.
WARNING
Is continuity measured
between system hydraulic
pressure connector, terminal
2 and black wire?
11 LOSS OF CRANE FUNCTIONS (SWING, TELESCOPE, BOOM AND HOIST) (CONT).
Read WARNING
on Page 2-2747
|