Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATION TEST
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-3      2-2771 (1)   Attempt to operate hoist and then boom lift using HOIST and BOOM control levers while holding TELE control lever in the IN position (TM 9-2320-364-10). (a)   If hoist and boom lift do not operate,  perform Steps (2) through (4) below and notify DS Maintenance. (b)   If hoist and boom do operate, check valve in four valve bank center manifold is faulty. Perform Steps (2) through (4) below and notify DS Maintenance. (2)   Set crane power switch to OFF position. (3)   Set hydraulic selector switch to OFF position. (4)   Turn OFF ENGINE switch. OPERATION TEST

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business