Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: VOLTAGE TEST
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-4      2-3051 (1)   Connect positive (+) multimeter lead to relay R33, terminal 86. (2)   Connect negative (–) multimeter lead to a known good ground. (3)   Set arctic heater switch to START and then to ON position (TM 9-2320-364-10). (a)   If 22 to 28 vdc are not present, turn OFF arctic heater switch and replace wire 1644 (see schematic Fig 2-74) or notify DS Maintenance. (b)   If 22 to 28 vdc are present, wire 1644 is OK.  Go to Step 9 of this Fault. (4)   Turn OFF arctic heater switch. VOLTAGE TEST Remove all jewelry such as rings, dog tags, bracelets, etc.  If jewelry or tools contact positive electrical circuits, a direct short may result.  Damage to equipment, injury or death to personnel may occur. (1)   Set multimeter select switch to ohms. (2)   Is there continuity between relay R33, terminal 85 and a known good ground? (a)   If there is no continuity, repair wire 1435 (see schematic Fig 2-74) or notify DS Maintenance. (b)   If there is continuity, wire 1435 is OK. CONTINUITY TEST NOTE Relay test must be performed with relay partially removed.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business