| |
TM 9-2320-364-20-4
12-186
Materials/Parts
Cable Tie (Item 26, Appendix C)
Sealing Compound (Item 72, Appendix C)
This task covers:
a. Removal
c. Cleaning/Inspection
e. Installation
b. Disassembly
d. Assembly
f. Follow-On Maintenance
INITIAL SETUP
Materials/Parts - Continued
Solvent, Drycleaning (Item 87, Appendix C)
Tags, Identification (Item 88, Appendix C)
Locknut (2) (Item 133, Appendix F)
Equipment Condition
Engine OFF, (TM 9-2320-364-10)
Wheels chocked, (TM 9-2320-364-10)
Air system drained, (TM 9-2320-364-10)
LHS fully extended, (TM 9-2320-364-10)
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(Item 74, Appendix G)
Gloves, Chemical Oil Protective
(Item 28, Appendix G)
Goggles, Industrial (Item 30, Appendix G)
Vise, Machinists (Item 75, Appendix G)
12-38. AIR MANIFOLD/AIR REGULATOR/PRESSURE PROTECTION VALVE
ASSEMBLY REPAIR.
a.
Removal.
Tag and mark air lines, elbows, fittings and adapters prior to removal.
Remove cable ties as required.
(1)
Remove air line 2133 (1) from elbow (2).
(2)
Remove air line 2613 (3) from elbow (4).
(3)
Remove air line 2044 (5) from elbow (6).
(4)
Remove air line 2003 (7) from elbow (8).
|