Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: d. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-4 12-202 12-41.  AIR GOVERNOR AND BRACKET REPLACEMENT/ADJUSTMENT (CONT). (13) Start engine. (14) If cut-out air pressure does not cut out at 121 to 129 psi (834 to 889 kPa), shut off engine and repeat Steps (8) through (13).  If cut-out pressure is between 121 to 129 psi (834 to 889 kPa), go to Step (15). (15) Shut OFF engine. (16) Drain air from No. 1 air tank. (17) Remove air pressure gage from elbow (2). (18) Connect air line 2159 (1) on elbow (2). d. Follow-On Maintenance: Start engine, (TM 9-2320-364-10). Build up air pressure to 125 psi (861 kPa). Shut OFF engine, (TM 9-2320-364-10). Check for air leaks, (TM 9-2320-364-10). Install right side noise panel, (Para 17-25). Install spare tire, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK AIR PRESSURE GAGE 1 2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business