Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-4      7-15 (18) Position three alternator belts (15) on alternator (11) and engine pulley (16). (19) Install nut (5), lockwasher (13) and washer (12) on alternator arm (6). (20) Position alternator support arm (6) in bracket (14). (21) Tighten screw (37) to 170 lb-ft (23 N.m). (22) Position alternator support arm (6) on alternator (11) with screw (10) and locknut (9). (23) Position washer (8), lockwasher (7) and nut (4) on alternator support arm (6). (24) Install belt tensioning gage on belts (15). (25) Tighten nut (5) on alternator support arm (6) until alternator belts tension reaches 60 to 65 lbs (260 to 289 N). (26) Tighten nut (4) on alternator support arm (6). (27) Remove belt tensioning gage from belts (15). (28) Tighten locknut (9) on screw (10) to 26 to 30 lb-ft (30 to 41 N.m). (29) Tighten nut (1) on screw (2) and alternator mounting bracket (3) to 90 lb-ft (122 N.m). c. Follow-On  Maintenance: Adjust alternator belts, (Para 7-5). Install hydraulic drive shaft, (Para 20-2). Install cab engine access panel, (Para 17-24). Install left front noise panel, (Para 17-27). Connect batteries, (Para 7-87). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business