Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-4 11-12      11-6.  AXLE NO. 2 LOCKING CYLINDER LINES AND FITTINGS REPLACEMENT (CONT). (6) Install preformed packing (10) and washer (9) on fitting (7). (7) Install preformed packing (5) and washer on fitting (2). (8) Install fitting (7) in locking cylinder (8). (9) Install air line 2056 (6) on fitting (7). (10) Install fitting (2) in locking cylinder (3). (11) Install air line 2420 (1) on fitting (2). c. Follow-On Maintenance: Start engine, (TM 9-2320-364-10). Build up air pressure to 125 psi (861 kPa). Shut OFF engine, (TM 9-2320-364-10). Check for air leaks, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business