Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-4 12-50      12-11.  FRONT DOUBLE CHECK VALVE REPLACEMENT (CONT). (15) Install top double check valve (8) on front gladhand bracket (9) with screw (7) and locknut (6). NOTE If truck is not equipped with remote oil filter, perform Steps (16) through (18). If truck is not equipped with remote oil filter, perform Steps (19) and (21). (16) Install air line 2689 (4) on adapter (5). (17) Install air line 2684 (3) on elbow (2). (18) Install air line 2686 (1) on adapter (5). (19) Install air line 2689 (4) on elbow (2). (20) Install air line 2684 (3) on elbow (2). (21) Install air line 2686 (1) on elbow (2). c. Follow-On Maintenance: Start engine, (TM 9-2320-364-10). Build up air pressure to 125 psi (861 kPa). Shut OFF engine, (TM 9-2320-364-10). Check for air leaks, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business