Quantcast b. Follow-On Maintenance - TM-9-2320-364-20-5_130

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
14-12.  TIE-ROD AND DRAG LINK INSPECTION
Up
TM-9-2320-364-20-5 Palletized Load System (PLS) M1074/M1075 Manual
Next
14-13.  90 DEGREE GEAR BOX REPLACEMENT
TM 9-2320-364-20-5 14-42      14-12.  TIE-ROD AND DRAG LINK INSPECTION (CONT). (3) Measure results. If: (a) If movement is 1/8 inch (3.2 mm) or less no further action is required. (b) If movement is between 1/16th inch (1.6 mm) and 1/8th inch (3.2 mm) plan to replace the end at the next scheduled service interval. (c) If tie-rod end movement is 1/8th inch (3.2 mm) or more replace end immediately (Para 14-11). If drag link movement is greater than 1/8th inch (3.2 mm) notify Direct Support. b. Follow-On Maintenance Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.