Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 18-3. BOOM WEAR PADS INSPECTION/REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5      18-5 This task covers: a.  Inspection c.   Installation b.  Removal d.   Follow-On Maintenance INITIAL SETUP Materials/Parts Grease (Item 42, Appendix C) Sealing Compound (Item 74, Appendix C) Sealing Compound (Item 77, Appendix C) Tags, Identification (Item 88, Appendix C) Equipment Condition Engine OFF, (TM 9-2320-364-10) Wheel chocked, (TM 9-2320-364-10) Tools and Special Tools Tool Kit, General Mechanic’s:  Automotive (Item 74, Appendix G) Drill Set, Twist (Item 19, Appendix G) Jackstand (Item 42, Appendix G) Wrench, Torque (0 to 175 lb-ft [0 to 237 N.m]) (Item 95, Appendix G) 18-3.  BOOM WEAR PADS INSPECTION/REPLACEMENT. a. Inspection. Ensure boom does not contact LHS hook arm or damage to equipment may result. NOTE Ensure boom is not supported or binding. There are three sets of wear pads. Do all inspections of boom wear pads in a. Inspection before proceeding to b. Removal. (1) Fully extend boom (1) over stowage box (2).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business