Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: e. Installation.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5 18-36      18-8.  CRANE HOOK BLOCK, HOOK AND CLEVIS REPAIR (CONT). e. Installation. Wire rope can become frayed or contain broken wires. Wear heavy leather-palmed work gloves when handling wire rope. Never let moving wire rope slide through hands, frayed or broken wires can cause injury to personnel. (1) Position cable (8) through hook block (9). (2) Position cable (8) through hole in open wedge socket clevis (5). (3) Make loop in cable (8) and position free end of cable through second hole in open wedge socket clevis (5). (4) Install wedge (7) in cable loop.  Drive wedge and cable loop into open wedge socket clevis (5). NOTE When installed properly, open wedge socket clevis should rotate freely on fly section. (5) Install open wedge socket clevis (5) on fly section (6) with screw (4), washer (3), castle nut (2) and cotter pin (1). f. Follow-On Maintenance: Lubricate hook block, (Para 2-9). Operate crane, (TM 9-2320-364-10). Load test crane, (TM 9-2320-364-34). Stow crane, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business