Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5 19-18      19-7.  WINDSHIELD WIPER IDLER SHAFT REPLACEMENT (CONT). NOTE Remaining steps are performed inside cab. Conlink is installed by snapping on idler shaft. (4) Install conlink (7) on idler shaft (8). NOTE Remaining steps are for right side only.  For left side, continue with c. Follow-On Maintenance. (5) Position divider panel (4) inside glove box (6). (6) Install divider panel (4) to dash (3) with screw (5). (7) Install screw (1) and locknut (2) in divider panel (4) and dash (3).  Tighten locknut to 23 lb-ft (31 N.m). c. Follow-On Maintenance: Install wiper arm, (Para 19-5). Install instrument panel (left idler shaft only), (Para 7-13). Check operation of wipers, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business