Quantcast c. Follow-On Maintenance - TM-9-2320-364-20-5_513

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Gasket strip
Up
TM-9-2320-364-20-5 Palletized Load System (PLS) M1074/M1075 Manual
Next
19-13.  HEATER BLOWER MOTOR REPLACEMENT
TM 9-2320-364-20-5      19-39 NOTE Steps (15) through (18) are performed outside of the truck. (15) Remove four plugs from two heater hoses (18) and (21) and heater assembly (12). (16) Install heater hose (18) on heater assembly (12) and tighten hose clamp (17). (17) Install heater hose (21) on heater assembly (12) and tighten two hose clamps (19) and (20). (18) Close front access cover (16). NOTE Remaining steps are performed inside cab. Valves are opened by turning counterclockwise. (19) Open two valves (15) at right front engine. c. Follow-On Maintenance: Install heater front cover, (Para 17-5). Install heater compartment access panel, (Para 17-4). Install electronic control box cover, (Para 17-22). Install cab engine access panel, (Para 17-24). Fill radiator, (Para 2-9). Connect batteries, (Para 7-87). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +