Quantcast c. Follow-On Maintenance - TM-9-2320-364-20-5_540

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
b. Installation - TM-9-2320-364-20-5_539
Up
TM-9-2320-364-20-5 Palletized Load System (PLS) M1074/M1075 Manual
Next
19-19.  HEATER/DEFROSTER TUBING REPLACEMENT
TM 9-2320-364-20-5 19-66      19-18.  HEATER CONTROL VALVE REPLACEMENT (CONT). (5) Set heater control panel OFF/HEAT control (1) to OFF position. (6) Pull heater control valve lever (6) rearward against stop. (7) Install cable (4) on valve lever (6) while keeping lever in rearward position. (8) Install cable (4) in clamp (5) and tighten screw (3). c. Follow-On Maintenance: Check coolant level, (TM 9-2320-364-10). Start engine, (TM 9-2320-364-10). Check for coolant leaks, (TM 9-2320-364-10). Shut OFF engine, (TM 9-2320-364-10). Install cab engine access panel, (Para 17-24). Install Electronic Control Box (ECB) right side panel, (Para 17-21). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +