Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5      13-27 (2) Install CTIS controller (5) in dash panel (12) and CTIS controller mounting bracket (13). (3) Install two star washers (11) and nuts (10) on CTIS controller mounting studs (9). (4) Install three ground wires (8) and locknut (6) on CTIS mounting stud (9). (5) Install connectors MC105 (4), MC35 (1), MC111 (2) and MC110 (3) on rear of CTIS controller (5). c. Follow-On Maintenance: Connect batteries, (Para 7-87). Check CTIS controller operation, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business