Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-on Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5      21-81 (2) Install valve (7) into auxiliary supply valve (9). (3) Install coil (4) on valve (7) with nut (8). Tighten nut to 48-72 lb-in (5-8 N.m). (4) Install button (6) on valve (7) with screw (5). (5) Install gasket (3) and connector MC134 (2) on coil (4) with screw (1). c. Follow-on Maintenance: Fill main hydraulic reservoir, (Para 20-11). Connect batteries, (Para 7-87). Start engine and allow to idle for five minutes, (TM 9-2320-364-10). Shut off engine and check for hydraulic leaks, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK 7 9 8 6 4 5 3 4 1 2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business