Quantcast b. Disassembly - TM-9-2320-364-20-5_777

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Disassembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
21-33.  CONTAINER HANDLING UNIT (CHU) LONG STRUT BRACKET ASSEMBLY REPAIR
Up
TM-9-2320-364-20-5 Palletized Load System (PLS) M1074/M1075 Manual
Next
Swaging sleeves - TM-9-2320-364-20-5_778
TM 9-2320-364-20-5      21-159 Right strut bracket assembly weighs 80 lbs (36 kg). Attach suitable lifting device to prevent possible injury to personnel. (3) Remove two screws (7) and locknuts (8) from strut bracket (9) and crossover tube (10).  Discard locknuts. (4) Remove two screws (11) and locknuts (12) from strut bracket (9), hardlift bracket (13) and frame (14).  Discard locknuts. (5) Remove two screws (15), locknuts (16) and strut bracket (9) from deck bracket (17) and frame (14). Discard locknuts. b. Disassembly. Use care when removing snap and retaining rings.  Snap and retaining rings are under spring tension and can act as projectiles when released and could cause severe eye injury. (1) Remove retaining ring (1), spacer (2) and pin (3) from long strut (4).  Discard retaining ring. (2) Remove long strut (4) from strut bracket (5). 9 7 8 10 11 12 13 14 3 2 1 4 5 15 16 17

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +