Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Swaging sleeves
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5 21-178 21-35.   CONTAINER HANDLING UNIT (CHU) LIFTING FRAME ASSEMBLY REPLACEMENT (CONT). NOTE There are two container locks and half height container hooks. Both are removed the same way. Right side is shown. (16) Remove lock pin (35), pin (36) and container lock (37) from lifting frame stow bracket (38). (17) Remove two swaging sleeves (39) and wire rope (40) from container lock (37), pin (36) and lock pin (35). (18) Remove lock pin (41), pin (42) and half height container hook (43) from lifting frame stow bracket (38). (19) Remove two swaging sleeves (44) and wire rope (45) from half height container hook (43), pin (42) and lock pin (41). (20) Remove four screws (46) and two long wear pads (47) from lifting frame (18). (21) Remove four screws (48) and two short wear pads (49) from lifting frame (18). 46 45 44 43 42 41 40 39 18 38 37 36 35 49 48 47 44 39

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business