Quantcast d. Follow-On Maintenance - TM-9-2320-364-20-5_809

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: d. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
c. Installation. - TM-9-2320-364-20-5_808
Up
TM-9-2320-364-20-5 Palletized Load System (PLS) M1074/M1075 Manual
Next
21-38.  CONTAINER HANDLING UNIT (CHU) LIFTING FRAME FLIPPER BRACKET AND LOCK PLATE REPAIR
TM 9-2320-364-20-5      21-191 (4) Install two nuts (4) on screws (5). NOTE Ensure tab on hand nut faces up. (5) Hold handle lock plate (1) up and rotate lower container lock handle (2) up to (locked) position. (6) Release handle lock plate (1) on lifting frame (3). d. Follow-On Maintenance: Lubricate lock plate, (TM 9-2320-364-10). Install lifting frame on truck, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK 1 2 3 TAB LOCKED

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +