Quantcast c. Follow-on Maintenance - TM-9-2320-364-20-5_848

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-on Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Auxiliary fuel tank
Up
TM-9-2320-364-20-5 Palletized Load System (PLS) M1074/M1075 Manual
Next
21-47.  CONTAINER HANDLING UNIT (CHU) LIFTING FRAME STRAP REPLACEMENT
TM 9-2320-364-20-5 21-230 21-46.   CONTAINER HANDLING UNIT (CHU) FRONT SUPPORT BRACKETS REPLACEMENT (CONT). Front support assembly weighs 660 lbs (299 kg).  Attach suitable lifting device to prevent possible injury to personnel. (16) Attach lifting device to front support assembly (1). (17) Position front support assembly (1) on right support assembly (4) and left support assembly (5). (18) Install 18 screws (3) and locknuts (2) to front support assembly (1), right front support bracket (4) and left front support bracket (5). (19) Remove lifting device from front support assembly (1). c. Follow-on Maintenance: Install CHU air lines, (Para 12-36). Install CHU deck weldment, (Para 21-40). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK 2 5 3 4 1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +