Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 22-5. MACHINE GUN PLATFORM INSTALLATION/STORAGE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5 22-8      Materials/Parts Locknut (5) (Item 91, Appendix F) This task covers: a.  Installation b.   Storage c.  Follow-On Maintenance INITIAL SETUP Equipment Condition Engine OFF, (TM 9-2320-364-10) Wheels chocked, (TM 9-2320-364-10) Tools and Special Tools Tool Kit, General Mechanic’s:  Automotive (Item 74, Appendix G) 22-5.  MACHINE GUN PLATFORM INSTALLATION/STORAGE. a. Installation. (1) Remove eight screws (1) and right Electronic Control Box (ECB) cover (2) from right ECB (3). (2) Remove eight screws (4) and heater access panel (5) from heater compartment (6). (3) Remove five plugs (7) from right ECB (3) and heater control side panel (8). (4) Install platform bracket (9) on right ECB (3) and heater control side panel (8) with five screws (10), washers (11) and locknuts (12).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business