Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5 14-8      14-3.  STEERING TOE-IN ADJUSTMENT (CONT). NOTE For Axle No. 1 and 5 perform Step (17). For Axle No. 2 perform Step (18). (17) Install locknut (8) on clamp (9) and tie-rod end (6).  Tighten locknut (8) on clamp (9) to 80 to 90 lb-ft (108 to 122 N.m). (18) Install locknut (8) and clamp (9) on tie-rod end (6).  Tighten locknut (8) on clamp (9) to 50 to 60 lb-ft (68 to 81 N.m). (19) Install castle nut (5) on tie-rod end (6). Tighten castle nut (5) to 150 to 200 lb-ft (203 to 207 N.m). NOTE It may be necessary to further tighten nut to line up slots for cotter pin installation. (20) Install cotter pin (4) in castle nut (5) and tie-rod end (6). (21) Using hydraulic jack, raise Axle No. 5 (1), remove jackstands and lower axle. b. Follow-On Maintenance: Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business