Quantcast d. Assembly - TM-9-2320-364-34-2_1021

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: d. Assembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
c. Cleaning/Inspection. - TM-9-2320-364-34-2_1020
Up
TM-9-2320-364-34-2 Palletized Load System (PLS) M1074/M1075 Manual
Next
e. Installation - TM-9-2320-364-34-2_1022
TM 9-2320-364-34-2      12-23 d. Assembly. NOTE Ensure sockets are installed as noted prior to removal. (1) Position intergear link (1) in soft jawed vise. NOTE Do not perform Steps (2) and (3) if socket is lube for life. (2) Install grease fitting (7) on socket (3). (3) Install dust boot (2) on socket (3). (4) Install socket (3) on intergear link (1). (5) Install screw (5) and locknut (4) on clamp (6).  Tighten locknut to 50 to 60 lb-ft (68 to 81 N.m). (6) Repeat Steps (2) through (5) for remaining socket (3).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +