Quantcast c. Follow-On  Maintenance - TM-9-2320-364-34-2_1063

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Front steering gear
Up
TM-9-2320-364-34-2 Palletized Load System (PLS) M1074/M1075 Manual
Next
12-10.  INTERMEDIATE STEERING GEAR AND PITMAN ARM REPLACEMENT
TM 9-2320-364-34-2      12-65 (32) Apply hydraulic oil to performed packing (5) and (6). (33) Install preformed packings (5) and (6) and hose 2877 (1), hose 2301 (2), hose 2928 (3) and hose 2878 (4). c. Follow-On  Maintenance: Install skid plate crossmember, (TM 9-2320-364-20). Install skid plate structure, (TM 9-2320-364-20). Install skid plate, (TM 9-2320-364-20). Fill steering reservoir, (TM 9-2320-364-20). Lube steering gear, drag link and intergear link, (TM 9-2320-364-20). Start engine, (TM 9-2320-364-10). Turn steering wheel back and forth three times. Shut off engine, (TM 9-2320-364-10). Check steering reservoir level, (TM 9-2320-364-20). Fill steering reservoir as required, (TM 9-2320-364-20). Perform steering adjustments, (Para 12-8). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +