Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-2      12-79 Steering gear weighs 165 lbs (75 kg). Attach suitable lifting device prior to installation to prevent possible injury to personnel. (21) With the aid of an assistant, install steering gear (4) and bracket (21) on frame (22) with four screws (18) and (19) and locknuts (20). (22) Remove lifting device from steering gear (4). NOTE Install cable ties as required Install elbows as noted prior to removal. (23) Apply hydraulic oil to two preformed packings (12). (24) Install two preformed packings (12), hose 2275 (10) and hose 2276 (11) on elbows (13) and (14). (25) Install pin (16) and clip (15) in hard lift point (17). (26) Install drag link (9) in pitman arm (8) with screw (7), lockwasher (6) and nut (5). (27) Install end yoke (3) on steering gear (4) with screw (1) and locknut (2). c. Follow-On  Maintenance: Lube steering gear and pitman arm, (TM 9-2320-364-20). Start engine, (TM 9-2320-364-10). Turn steering wheel back and forth three times. Shut off engine, (TM 9-2320-364-10). Check steering reservoir, (TM 9-2320-364-20). Fill steering reservoir as required, (TM 9-2320-364-20). Perform steering adjustments, (Para 12-8). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business