Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-2      3-117 (15) Insert 0.0015 in. (0.0381 mm) feeler gage between end of valve bridges (1) and (2) and exhaust valve stem (6). (16) Press down on top surface of valve bridges (1) and (2).  Feeler gage must remain tight against valve (6) and valve bridge (1) and (2). (17) Repeat Steps (15) and (16) for other end of valve bridges (1) and (2). c. Follow-On  Maintenance: Install fuel injectors, (Para 4-2). Install engine brake retarders, (Para 3-32). Install rocker arms, (Para 3-20). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business