Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-2 3-126      3-20.  ROCKER ARM REPLACEMENT (CONT). Do not force rocker arms all the way back with shaft in place.  Failure to comply may result in damage to equipment. Rocker arms need to be moved up and toward center of engine to permit removal of shaft or damage to equipment may occur. NOTE Individual rocker arms and shafts must be maintained in sets.  Tag and mark each set prior to removal. (3) Remove shaft (4) from rocker arms (5). NOTE Rocker arms are removed by lifting up on rocker arm and turning rocker arm counterclockwise until rocker arm and clevis yoke are removed from push rod. Rocker arm and clevis yoke are removed as one assembly. (4) Remove three rocker arms (5) and clevis yokes (6) from push rods (1). (5) Repeat Steps (1) through (4) for each rocker arm being removed. b. Installation. NOTE All rocker arms are installed the same way. Assemble rocker arms as tagged prior to removal. (1) Install three rocker arms (5) on push rods (1) until end of each push rod is flush with or above inside of each clevis yoke (6).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business