Quantcast 6-35.  ECB/TRANSMISSION WIRE HARNESS REPLACEMENT

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 6-35. ECB/TRANSMISSION WIRE HARNESS REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
c. Follow-On Maintenance - TM-9-2320-364-34-2_674
Up
TM-9-2320-364-34-2 Palletized Load System (PLS) M1074/M1075 Manual
Next
Open front access cover
TM 9-2320-364-34-2      6-349 Materials/Parts Cable Ties (Item 9, Appendix B) Tags, Identification (Item 72, Appendix B) Locknut (7) (Item 176, Appendix E) Lockwasher (Item 251, Appendix E) This task covers: a.  Removal b.   Installation c.  Follow-On Maintenance INITIAL SETUP Equipment Condition Engine OFF, (TM 9-2320-364-10) Wheels chocked, (TM 9-2320-364-10) LHS fully extended, (TM 9-2320-364-10) Batteries disconnected, (TM 9-2320-364-10) Left side noise panel removed, (TM 9-2320-364-20) Electronic Control Box (ECB) right side panel removed, (TM 9-2320-364-20) Electronic Control Box (ECB) top panels removed, (TM 9-2320-364-20) Tools and Special Tools Tool Kit, General Mechanic’s (Item 240, Appendix F) 6-35.  ECB/TRANSMISSION WIRE HARNESS REPLACEMENT. a. Removal. NOTE Remove cable ties as required. Connectors are removed by gently prying on tab and pulling apart connectors. (1) Loosen screw (1).  Disconnect MC10 connector (2). (2) Remove nut (3), lockwasher (4), washer (5), double braided ground wire (6) and washer (5) from stud (7).  Discard lockwasher. (3) Disconnect MC36 connector (8). (4) Remove locknut (9), screw (10) and clamp (11) from MC10 connector (2).  Discard locknut. (5) Remove four screws (12), plates (13) and rubber grommet (14) from electronic control box (15). (6) Push ECB/transmssion wire harness (16) through ECB (15).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +