Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Move boom extension
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3      16-17 Outer-mid section weighs 800 lbs (363 kg).  Attach suitable lifting device prior to removal to prevent possible injury to personnel. (22) Attach lifting device on outer-mid section (40). NOTE Tag wear pads as to side and extension.  Note location and quantity of any shims. (23) Lift up on outer-mid section (40) and remove wear pads (45). NOTE Perform Step (24) if wear pad has shim and screw. (24) Remove screw (46) and shim (47) from wear pads (45).  Discard wear pads. NOTE Move boom extension slowly. Cable may become caught on inner-mid section. Reposition lifting device as needed to balance outer-mid section. (25) Remove outer-mid section (40) with cable (8) from inner-mid section (20).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business