Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Route cable through inner-mid section
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 16-44      16-3.  BOOM ASSEMBLY REPAIR (CONT). Outer-mid section weighs 800 lbs (363 kg).  Attach suitable lifting device prior to installation to prevent possible injury to personnel. (99) Attach lifting device to inner-mid section (20). (100) With the aid of two assistants, route cable (8) through inner-mid section (20) while slowly installing outer-mid section (40) into inner-mid section (20). (101) As cable (8) gets close to rear of inner-mid section (20), pull cable (8) through and route around sheaves (52).  Pull cable (8) and slowly slide into outer-mid section (40) until section is half installed.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business