Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Position hoist assembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3      16-87 To avoid damage to load cell cable and tension load cell, do not allow cell to turn when installing nut. Ensure that nuts have at least two full threads showing after installing on load cell. (6) Position hoist assembly (1) into hoist mount (7) and install front nut (6) on tension load cell (5). (7) Install end cap (4), swivel nut (3) and jam nut (2) on tension load cell (5).  Install jam nut loosely. (8) Adjust overload switch to 0.12 in. (3 mm) by loosening or tightening nut (6) until gap between hoist assembly (1) and hoist mount (7) is obtained. (9) Tighten jam nut (2) on tension load cell (5). (10) Remove lifting device from hoist assembly (1).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business