Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: a. Removal
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 16-162 16-25.  TENSION LOAD CELL REPLACEMENT (CONT). a. Removal. Hoist weighs 210 lbs (95 kg).  Attach suitable lifting device prior to removal to prevent possible injury to personnel. (1) Attach lifting device around hoist assembly (1). (2) Remove screw (2) and block (3) from end cap (4). To avoid damage to tension load cell, hold cable while removing nuts.  Do not allow tension load cell to move or wiring may be damaged. To avoid damage to load cell, use care when lowering or raising hoist assembly. NOTE Count exposed threads on tension load cell before nuts are removed to ensure nuts are reinstalled to the same positions. Raise or lower lifting device to allow hoist assembly to rotate forward and down slightly to gain better access to nuts during removal. (3) Remove jam nut (5), swivel nut (6), swivel nut (7) and end cap (4) from tension load cell (8).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business