Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: e. Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 16-204 16-28.  TWO FUNCTION CONTROL VALVE BANK REPAIR (CONT). (8) Install six shims (6), right outrigger valve (3) and left outrigger valve (5) on manifold (4) with three studs (2) and six nuts (1).  Tighten nuts evenly 20 to 23 lb-ft (27 to 31 N.m). e. Installation. (1) Apply hydraulic oil to four preformed packings (39). (2) Install four preformed packings (39) and fittings (37) in two function control valve bank (34). (3) Apply hydraulic oil to preformed packing (40). (4) Install preformed packing (40) and fitting (38) in two function control valve bank (34). (5) Apply hydraulic oil to preformed packings (43) and (44). (6) Install preformed packings (43) and (44) and elbows (41) and (42) in two function control valve bank (34).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business