Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: f. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 16-206 16-28.  TWO FUNCTION CONTROL VALVE BANK REPAIR (CONT). (13) Apply hydraulic oil to preformed packings (25), (22), (19) and (16). (14) Install preformed packing (25) and hose (24) on elbow (26). (15) Install preformed packing (22) and hose (21) on elbow (23). (16) Install preformed packing (19) and hose (18) on elbow (20). (17) Install four preformed packings (16), two hoses (15) and hoses (14) on four fittings (17). Adhesives, solvents, and sealing compounds can burn easily, can give off harmful vapors, and are harmful to skin and clothing.  To avoid injury or death, keep away from open fire and use in a well-ventilated area. (18) Apply sealing compound on threads of four screws (12). (19) Install cover (10) on brackets (6) and (13) with four screws (12), washers (11), washers (9), lockwashers (8) and nuts (7). Tighten nuts to 72 lb-in (8 N.m). (20) Install connector (5) in bracket (6) with nut (3) and lockwasher (4). (21) Install cap (2) on bracket (6). f. Follow-On  Maintenance: Check oil level, (TM 9-2320-364-10). Operate crane and check for oil leaks, (TM 9-2320-364-10). Load test crane, (Para 16-32). Stow crane, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business