| |
TM 9-2320-364-34-3
16-209
(5)
Install data plate (13) on mount (4) with
four rivets (12).
(6)
Install connector (9) with lockwasher (11)
and nut (10).
(7)
Install cap (8) on mount (4) and
connector (9).
(8)
Install high idle switch (7) in mount (4) with washer (6) and boot (5).
(9)
Install power switch (3) in mount (4) with washer (2) and nut (1).
c.
Follow-On Maintenance:
Install solenoid valve assembly, (Para 16-23).
Install main hydraulic pressure solenoid valve, (Para 16-24).
Install three valve bank, (Para 16-27).
Install four valve bank, (Para 16-26).
Remove wheel chocks, (TM 9-2320-364-10).
END OF TASK
|