Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: d. Assembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 16-254 16-39.  LOAD HANDLING SYSTEM (LHS) HOOK ARM REPAIR (CONT). (3) Inspect bushing for wear.  Replace bushing if pivot pin has worn through bushing surface and metal is showing through. (4) Wipe rubber bumpers with a clean cloth, do not use drycleaning solvent.  Replace bumper if rubber part is cracking, crumbling or loose from threaded metal base. d. Assembly. NOTE Apply light coat of grease to outer surface of bushings prior to installation. Apply light coat of grease to threads of removal/ installation tool prior to use. (1) Using hook arm and middle frame bushing removal/installation tool (use five of six pieces), align lube hole in bushing (6) with lube fitting hole in hook arm (3) and install two bushings in hook arm as shown. NOTE If lube fitting hole is restricted by bushing, go to Step (4) of removal. (2) Check lube fitting hole in hook arm (3) for restrictions. (3) Install two lube fittings (5) in hook arm (3). NOTE Apply light coat of grease to outer edges of seals prior to installation. (4) Install four seals (4) in hook arm (3).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business