Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3      16-297 (71) Install cover (3), four lockwashers (2) and screws (1) on LHS main manifold bracket assembly (4). (72) Install cushion clip (7) on LHS main manifold bracket assembly (4) with screw (6) and locknut (5). (73) Install worklight (8) on LHS main manifold bracket assembly (4). c. Follow-On  Maintenance. Install LHS transit valve, (Para 17-11). Install LHS directional control valve, (Para 17-10). Install LHS solenoid valve and coil, (Para 17-9). Install LHS main manifold relief valve, (Para 17-8). Install LHS check valve, (Para 17-7). Install LHS main manifold load control valve, (Para 17-6). Connect batteries, (TM 9-2320-364-20). Start engine, (TM 9-2320-364-10). Check for oil leaks, (TM 9-2320-364-10). Shut off engine, (TM 9-2320-364-10). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business