Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3      13-5 Cab weighs 1,700 lbs (772 kg).  Attach suitable lifting device prior to installation of cab support to prevent possible injury to personnel. (8) Remove wooden blocks from between bottom of cab (6) and skid plate crossmember (8). (9) Lower cab (6) on cab mounting bracket (7). (10) Install two screws (5) in cab (6) and mounting bracket (7) with two washers and locknuts (3). (11) Remove two locknuts (1) from rear cab mount screws (2).  Discard locknuts. (12) Install two locknuts (1) on rear cab screws (2). c. Follow-On  Maintenance: Install Air Reservoir No. 1, (TM 9-2320-364-20). Install front blackout light, (TM 9-2320-364-20). Install electric horn, (TM 9-2320-364-20). Install skid plate structure, (TM 9-2320-364-20). Install machine gun mount, if equipped, (TM 9-2320-364-20). Connect batteries, (TM 9-2320-364-20). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business