Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Apply hydraulic oil to preformed packing
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-3 17-36      17-5.  MAIN HYDRAULIC SYSTEM ADJUSTMENT (CONT). (5) Disconnect hose 2295 (5) and remove preformed packing (6) from port G8 on multifunction manifold (7).  Discard preformed packing. (6) Install metal cap on port G8. (7) Apply hydraulic oil to preformed packing (6). (8) Position preformed packing (6) on adapter. (9) Install adapter and test fitting on hose 2295 (5). (10) Install long test hose between test fittings. (11) Set selector on flowmeter to LO FLOW. (12) Turn handle on loading valve to the left and open loading valve on flowmeter fully. (13) Start engine (TM 9-2320-364-10). Do not allow loading valve to remain closed longer than 10 seconds or damage to equipment may result. (14) Turn handle on loading valve to the right and slowly close loading valve on flowmeter. (a) If 3,675 psi +75 –50 psi (25,339 kPa +517, – 345 kPa) are not present on flowmeter pressure gage when flow drops to 0 gpm (0 lpm), go to Step (15). (b) If 3,675 psi +75 –50 psi (25,339 kPa +517, –345 kPa) are present on flowmeter pressure gage when flow drops to 0 gpm (0 lpm), main hydraulic pump control adjustment is OK, go to Step (21). (15) Shut OFF engine (TM 9-2320-364-10).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business