Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-4      20-57 NOTE Leave upper right and left screws installed at this time. (8) Remove eight screws (16) and washers (17) from cylinder head (8). (9) Install two lifting tees on cylinder head (8). Cylinder head with lifting tees weighs 182 lbs (83 kg).  Attach suitable lifting device prior to removal to prevent possible injury to personnel. (10) Remove two screws (16) and washers (17) from cylinder head (8). (11) Lift cylinder head (8) from engine block (15) and position on wooden blocks. (12) Remove and discard seal strip gasket (18), 16 water seals (19), oil seal (20) and four compression gaskets (21) from engine block (15). NOTE Note position and location of shims prior to removal. (13) Remove two support shims (22) from engine block (15).  Discard shims. (14) Remove two lifting tees from cylinder head (8) (15) Repeat Steps (8) through (14) for other cylinder head (23). b. Follow-On  Maintenance: Repair cylinder head, (Para 20-49). Remove blower drive assembly, (Para 20-20). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business