Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-4      20-267 NOTE Perform Steps (5), (7), (9) and (10) if oil tube brackets do not align with screw holes. (5) Loosen four nuts (10) and (11) on oil tube brackets (12). (6) Install two lockwashers (2) and screws (1) in oil tube brackets (12) and main bearing cap (13). (7) Adjust oil tube brackets (12) to seat firmly against main bearing cap (13). (8) Tighten two screws (1) on oil tube brackets (12) to 26 to 29 lb-ft (35 to 39 N.m). (9) Tighten two nuts (10) on oil tube brackets (12) to 26 to 29 lb-ft (35 to 39 N.m). (10) Tighten two nuts (11) on oil tube brackets (12) to 120 to 156 lb-in (14 to 18 N.m). b. Follow-On  Maintenance: Install engine oil pressure relief valve, (Para 20-78). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business