Quantcast b. Follow-On  Maintenance - TM-9-2320-364-34-4_354

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Follow-On Maintenance
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
20-92.  FUEL INJECTOR INSTALLATION
Up
TM-9-2320-364-34-4 Palletized Load System (PLS) M1074/M1075 Manual
Next
20-93.  ENGINE BRAKE RETARDER INSTALLATION
TM 9-2320-364-34-4      20-303 (3) Install fuel injector wire harness (9) and flange with gasket (8) on cylinder head (10) with two washers (7) and screws (6). (4) Connect wire terminals to fuel inlet block on fuel injector (5) and tighten retaining screws (4). (5) Remove caps from four fuel line connectors (3). (6) Apply lubricating oil to four preformed packings (2). (7) Using fuel line nut wrench, install four preformed packings (2) and two fuel lines (1) on connectors (3).  Tighten to 160 lb-in (18 N.m). (8) Repeat Steps (1) through (7) for other seven fuel injectors. b. Follow-On  Maintenance: Install engine brake retarders, (Para 20-93). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +