Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 20-93. ENGINE BRAKE RETARDER INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-34-4 20-304 This task covers: a.  Installation b.   Follow-On Maintenance INITIAL SETUP Equipment Condition Fuel injectors installed, (Para 20-92) Tools and Special Tools Tool Kit, General Mechanic’s (Item 240, Appendix F) Wrench, Torque (0 to 175 lb-ft [0-237 N.m]) (Item 277, Appendix F) 20-93.  ENGINE BRAKE RETARDER INSTALLATION. Materials/Parts Cable Ties (Item 9, Appendix B) a. Installation. NOTE There are two supply brakes and two drones on each cylinder bank.  All supply brakes and drones are installed the same way.  Right cylinder bank shown. (1) Position master piston fork assembly (1) of drone (2) over injector rocker clevis (3) and install with two screws (4) through rocker arm shaft (5) to cylinder head (6). (2) Tighten screws (4) to 45 lb-ft (61 N.m). (3) Tighten screws (4) to 88 to 92 lb-ft (119 to 125 N.m). (4) Move master piston fork assembly (1) up and down several times to make sure it rides freely on injector rocker clevis (3). (5) Repeat Steps (1) through (4) for other supply brakes (7) and drones (2).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business